Maintenance Work
Current Jobs:
1. Paint the front (south) of the building
2. Paint the bus barn walk in door
3. Paint trim around door as needed
4. Clean out sofit lights (birds nests) in front
5. Trim and prune; spray 3 bigger trees in front of center
6. Stucco around building/first between garage and main building
7. Patch screws sticking out around in the building and paint
8. Sheet metal around AC lines (new addition)
9. Metal trim around bus barn edge
10. Finish garage walking door knob job; still needs key lock inside installed
11. Foam wrap 4x4 by the swings on the deck
13. Possible paint walls inside building particularly around trash cans and under
serving window and west room.
1. Paint the front (south) of the building
2. Paint the bus barn walk in door
3. Paint trim around door as needed
4. Clean out sofit lights (birds nests) in front
5. Trim and prune; spray 3 bigger trees in front of center
6. Stucco around building/first between garage and main building
7. Patch screws sticking out around in the building and paint
8. Sheet metal around AC lines (new addition)
9. Metal trim around bus barn edge
10. Finish garage walking door knob job; still needs key lock inside installed
11. Foam wrap 4x4 by the swings on the deck
13. Possible paint walls inside building particularly around trash cans and under
serving window and west room.